Low income housing prototype utilizing pre manufactured plastic blocks, plastic beams, plastic beam pockets and corrugated plastic flooring panels. By incorporating these plastic products, construction time is cut using an industrial grade glue gun for composite block wall assemblies that gyp board is then screwed directly onto. Initially prepared as four- 18 unit apartments, the buildings themselves are planned to be replicated throughout Florida. I worked independently with client, construction manager and engineers from Schematic through 100% Construction Documents using Revit 2018. Structural/product testing to be completed in 2021 for a construction start in early 2022.
Above: one of the 3d massings I did to digitally mockup pre manufactured plastic composite components for their appropriate combinations as I worked through Construction Documents (quite similar to creating my own shop drawings).
Associate,
Project Lead
Arquitectonica, 2018
Construction to begin 2022
Project Lead
Arquitectonica, 2018
Construction to begin 2022